Astrophotography – Flat Frame box

Now that I have the scope in the observatory on a wedge it’s time to start doing a little more astrophotography. And one issue I immediately ran into, especially with the field flattener in place, was the need for decent flat field images. I needed to make a flat box…

Read more

First image in the observatory – M57

I tried taking some deep sky images last night for the first time in several years. Not an ideal setup for my C9.25 – altaz mount, no guiding, no PEC training, no electronic focuser, unmodded Canon 400d and a bright Moon. Given that, I’m happy with the result of 20x30s exposures on one of my favourite objects: Read more

Building an Observatory – Part 7 – First Light! Phase 1 complete!

Well we finally got first light! ok it was sunlight reflected off the clouds but it counts!

The first job today was to drill down into the concrete base to anchor in the 12mm bolts in place. The local building suppliers had Rawl R-KEM which is a two part epoxy that comes in a 300ml tube, it mixes in the nozzle so its easy to apply. With the bolts in place the pier was put in place and leveled: Read more

Building an Observatory – Part 5

The shed part is pretty much complete now. Last weekend I made the door, got the rest of the weathersheeting in place, finished the roof, and got the wood preservative on. I also added a 2×3 to strengthen the beam with the castors so that the ends no longer touch the track; I’ve to do the same to the other side sometime, but as it stands I can move the roof easily with one hand.  Read more

Building and Observatory – Part 4

In between rain showers I’ve managed to almost get the building work completed on the observatory. Building the support for the roof and rails was easy enough though the beams were very slightly warped; this doesn’t matter too much as it can be corrected by placing the rails in the correct line.

The roof was trickier than I thought. I hadn’t tried to build a roof before and it’s quite easy to get things out of alignment and not straight. It’s not perfect but more than good enough for my requirements. Read more

Building and Observatory – Part 2

This summer has been uncharacteristically wet. And it wasn’t until last Saturday that I got to take the wood out from under the tarpaulin and start working. The first thing to do was to get the floor joists in place. The longest part of that was ensuring the 2×4 frame was level. Read more